Existing buildings & renovation. With minimal effort.
In an existing building, every intervention counts. The heating paint needs only minimal work: the electrician lays the supply cables, and the technology takes up very little space.

Minimal effort in existing buildings
A new heating system in an existing building usually means major work: boiler, boiler room, water pipes, often a new screed. The heating paint needs only minimal work. Every room is its own heating system with its own control.
- The electrician lays the supply cables
- All technology (transformer, controls) in a single-family home on max. 1 m², approx. 10 cm high
- If desired, installed entirely in the ceiling – with inspection openings
- Floor build-up stays intact
- Can be done room by room – in stages, too
What you no longer need.
What you no longer need
What stays
Every room is its own heating system with its own control.
Every wall is planned individually.
In existing buildings, material and layer build-up determine the design. CARBON4® plans for all typical construction methods:
Solid & heat-retaining
Often uninsulated – thermal decoupling in front of the heating surface.
Historic
High capillary moisture absorption; vapour-permeable internal insulation, e.g. wood fibreboard.
Timber & infill
Vapour-permeable systems matched to the building physics, with clay or lime plaster.
Keeping an eye on damp
Renovation and lime plaster systems help the masonry dry out.
Do I need insulation in an older building?
Is the heating paint suitable for listed buildings?
Are there subsidies for renovation?
Am I allowed to heat with electricity in a rented older building?
You might also be interested in
Your project. Individually planned.
Initial consultation of 30–45 minutes, by phone or video call.