Skip to content
Consultation Partner

References. Projects with data.

From medieval nave to dome house: here we present selected projects with key data, site photos and thermal images.

Listed buildings

Historic buildings. Invisibly heated.

In a listed building, every intervention counts. The heating paint is applied on site, follows vaults and uneven masonry, and dries damp walls.

Bürgerspital and hospital church, St. Veit an der Glan – project photo
Listed building

Bürgerspital and hospital church, St. Veit an der Glan

Carinthia, Austria · now the district music school

The former Bürgerspital is a building complex with a medieval core, extended in the 17th century and given loggias and arcades in the courtyard. The hospital church is a small Gothic building. 1.5 m thick stone walls, damp in the lower section and salt efflorescence: the heating paint dries the masonry and heats the rooms at the same time.

Year of construction
1321
Area
approx. 200 m²
Masonry
Stone, 1.5 m
Initial situation
Damp in the lower section, salt efflorescence
Measure
Damp remediation + full heating
Heating surface
Wall
Installed output
approx. 20,000 W
Completion
December 2015
Speicherstadt Hamburg, Block L36A – project photo
Listed building

Speicherstadt Hamburg, Block L36A

UNESCO World Heritage Site, Germany

A 1910 warehouse building in a UNESCO World Heritage Site: the vaulted ceiling and external walls became heating surfaces – without altering the historic fabric.

Year of construction
1910
Area
120 m²
Construction
Vaulted ceiling, external walls in plasterboard
Measure
Primary heating
Heating surface
Walls and ceilings
Installed output
9.000 W
Completion
April 2016
Hl. Kreuz branch church, Windshausen – project photo
Listed building

Hl. Kreuz branch church, Windshausen

Nußdorf am Inn, Bavaria · pilgrimage church

A pilgrimage church with 1.5 m thick stone walls, damp in the lower section and some moss growth. The heating surfaces were applied directly to the masonry – the thermal images show the evenly warm plinth zone.

Year of construction
1321
Area
approx. 100 m²
Masonry
Stone, 1.5 m
Initial situation
Damp in the lower section, some moss growth
Measure
Damp remediation
Heating surface
Wall
Installed output
9.000 W
Completion
April 2017
St. Petri village church, Wörmlitz – project photo
Listed building

St. Petri village church, Wörmlitz

Halle (Saale), Germany

A Romanesque village church with 90 cm thick masonry. The walls were decoupled with thermal insulating plaster and are fully heated.

Year of construction
2nd half of the 12th century
Area
approx. 100 m²
Masonry
90 cm, decoupled with thermal insulating plaster
Measure
Primary heating
Heating surface
Wall
Installed output
approx. 12,000 W
Completion
October 2021
Palais 26, Villach – project photo
Listed building

Palais 26, Villach

Carinthia, Austria

A historic town palace as a hotel and restaurant: insulated on the inside and fully heated via walls, floors and ceilings.

Year of construction
approx. 15th century
Use
Hotel and restaurant
Area
approx. 300 m²
Masonry
thick stone walls, insulated on the inside
Measure
Primary heating
Heating surface
Walls, floors and ceilings
Installed output
approx. 30,000 W
Completion
2019
Hotel Drei Höfe – project photo
Listed building

Hotel Drei Höfe

Hesse, Germany

Timber framing with clay plaster: the heating paint follows the historic construction and heats walls, floors and ceilings.

Construction
Timber framing with clay plaster
Use
Hotel and restaurant
Area
approx. 300 m²
Measure
Primary heating
Heating surface
Walls, floors and ceilings
Installed output
approx. 30,000 W
Completion
2019
More projects

Existing buildings, new builds, special solutions.

Hover over an image – or tap it – to see the thermal image or construction phase.

Existing-building renovation, private house – project photoExisting-building renovation, private house – thermal image or construction phase
Existing buildingExisting-building renovation, private houseWalls and ceilings as heating surfaces in an occupied existing home.
Bogenhaus – project photoBogenhaus – thermal image or construction phase
New buildBogenhausCurved green-roof house with heated ceiling and wall surfaces.
Bike sports hall – project photoBike sports hall – thermal image or construction phase
New buildBike sports hallSales and workshop space with heating strips on the ceiling.
Radio station – project photoRadio station – thermal image or construction phase
New buildRadio stationOffice and studio building, heating fields along the staircase.
Chalet in Innerfragant – project photoChalet in Innerfragant – thermal image or construction phase
New buildChalet in InnerfragantAlpine timber house with invisible heat in walls and ceilings.
Sundome – project photoSundome – thermal image or construction phase
New buildSundomeDome house – the curved surfaces are divided into heating fields.
School – project photoSchool – thermal image or construction phase
Problem solvingSchoolTargeted heating strips at plinth height to combat cold walls.
Ice-free outdoor stairs – project photoIce-free outdoor stairs – thermal image or construction phase
Special solutionIce-free outdoor stairsHeating paint under the covering keeps the steps free of ice.
Steam bath – project photoSteam bath – thermal image or construction phase
Special solutionSteam bathRadiant heat in a wet area – under waterproofing and tiles.

Your project as our next reference?

Initial consultation of 30–45 minutes, by phone or video call.

Request a consultation →Call